Quick Guidelines of Industrial Electric HT Motor Pre-Commissioning checks:- Check for the proper fixing motor on the foundation. Check that the motor can be easily turned over by hand. Check motor winding resistance on each phase; verify that they are equal. IR value and PI value of the motor to be checked. IR values and HV test on the cable to be performed. Check all the tripping and alarm signals from winding and bearing TRDs (through scanner if provided) Testing of ht motor protection relay and tripping of the circuit breaker…
Read MoreYear: 2018
Commissioning Procedure for HV / HT Cable
Step by step Commissioning guidelines of HV/ HT Cable Check continuity of the HT cable to confirm R, Y and B phase at both ends as per marking. This is especially important when there is more than one run of cable phase; any cross-over will result in a dead short circuit. The Cable screen is to be earthed at one end only. Cable gland plate should be of non- magnetic type e.g. aluminum. Perform HV / HT test on the cable.Apply only Dc voltage, as cables have relatively higher capacitance. Check…
Read MoreElectrical Testing and commissioning -Safety Guidelines
Risk and Safety assessment for Electrical Testing and Commissioning Safety of testing and construction personnel should be the primary consideration at all times. The following are some guidelines to ensure safety : Ensure that proper safety gear is used. These include safety shoes, safety helmet, safety gloves(Rubber-Electrical), Rubber mat, fire extinguishers etc Whenever work is dine on power circuits (LT or HT), all power sources must be isolated by opening and withdrawing the circuit breakers. Earthing switches should be closed or if not available local earthing should be done.…
Read More